A liner is not a filler

When a slideway comes in with scoring, the instinct is to treat the damaged liner as the problem and bond a new sheet over whatever is underneath. That works only while the iron below is still flat. Turcite B is supplied as a thin sheet and is bonded with adhesive; neither is designed to bridge a groove, level a step, or absorb a depression. Whatever shape the parent metal has, the liner inherits it, minus nothing.

The consequence shows up later and somewhere else. A liner pressed over a groove cures with an unsupported band above the gap. Under load that band creeps, and the adhesive eventually lets go along the edge of the groove - which is why a liner that failed early so often lifts in a line, not in a patch. The failure looks like an adhesive problem and is really a geometry problem that was never addressed.

So the question at teardown is not how to cover the scoring. It is whether the scoring changed the surface the liner has to sit on, and if so, how to bring that surface back before any adhesive is opened.

First decide which kind of damage you have

Scoring covers a wide range of conditions that need completely different responses. Sorting them out at the bench, before ordering anything, saves the most time of any step in a reline.

The light end is cosmetic marking: discoloration, fine polishing tracks, and shallow scoring lines you can feel with a fingernail but that do not hold the nail. These sit inside the original machining marks and are usually the record of a chip that travelled through once. They do not change where the saddle sits.

The serious end is anything that has removed metal in a way you can measure with a straight edge and feeler stock, or where a raised lip has formed at the edge of the score. A raised lip is worse than the groove itself: it is a high spot, and a liner bonded over a high spot is pre-loaded from the first minute. Anywhere the straight edge rocks, or where a feeler slips under it next to the damage, you are no longer looking at cosmetic marking.

A quick check that separates the two: run a fine oil stone lightly along the way. Burrs and lips show up as bright speckles immediately. If the stone cuts, the surface has been deformed, not just marked.

Three routes, and what each one is for

In practice a worn machine often needs a combination: weld the deep isolated scores, then machine the whole way to a common surface. What matters is that the sequence is decided before work starts, because machining after bonding is not an option - you cannot true a liner by cutting it once it is on the machine.

  • Welding - for localised grooves and gouges in cast iron where the surrounding surface is still sound. Requires a filler matched to the casting, controlled heat input, and allowance for the fact that a weld bead on cast iron is not the same metallurgy as the parent. It is the most accessible route in a repair shop and the least forgiving if heat is not managed: distortion and hardening around the bead will show up as a step you then have to machine anyway.
  • Brush plating or selective deposition - for shallow, broad, evenly distributed loss where you want metal back without putting heat into the casting. It builds in thin layers and follows the existing surface, so it suits ways that have worn uniformly rather than been gouged. It will not fill a deep isolated groove economically, and it demands clean, correctly prepared substrate or the deposit will not adhere.
  • Machining - planing, grinding or milling the way back to a true surface. This is the route when the damage is widespread, when previous repairs have already left the surface uneven, or when the geometry has to be re-established rather than touched up. It removes material, so it changes the stack height and must be planned together with the liner thickness you intend to bond.

The surface a fresh repair leaves behind

A repaired way is not automatically a bondable way. The three things that most often ruin an otherwise correct reline are heat damage, contamination, and porosity, and all three come from the repair itself rather than from the liner.

Heat damage is the localised hardening and scale that follows welding on cast iron. Scale must come off completely - it is not a surface, it is a layer that will fail in shear under the liner. Hardened zones machine differently from the surrounding iron, so a way that felt flat under the straight edge can still cut unevenly, leaving a shallow step that is invisible until the liner is bonded and the machine is loaded.

Contamination is the oil that has been sitting in the casting for years. Scoring creates a path into the iron, and heat from welding pulls oil out of it. Any oil that reaches the surface after the final clean will migrate into the adhesive interface. Degreasing before machining is not enough; the surface has to be degreased again after machining, and the way protected until bonding.

Porosity is what you get when a groove is filled and then machined back: small voids open at the surface, some of them under the skin. A void under a liner is an unsupported spot, and adhesive that flows into it leaves a thin section next to a thick one. Where porosity is open, the practical options are to cut back and re-deposit, or to accept it only where the contact band does not run.

Judge the finished surface by what a scraper and marking paste show, not by eye. Blue laid on the way and rubbed against a true reference reveals both high spots and the low pockets a straight edge cannot see.

What to confirm before you open the adhesive

The point of no return is mixing the adhesive. Before that, five things should be physically checked, not assumed.

Flatness along the length of the contact band, checked with a straight edge and feeler stock in several positions rather than one. Freedom from raised lips at the edges of any repair, checked by hand and with a stone. Surface roughness consistent across the repaired and unrepaired areas - a patch of fresh machining next to original planing marks is two different bonding substrates, and adhesive behaves differently on each. No residual oil or coolant, confirmed by a clean white cloth wiped across the surface and inspected. And a dry, dust-free way protected from the moment it passes inspection, because a way that sits open in a shop overnight collects exactly the contamination the last step removed.

If any of those five cannot be confirmed, the correct move is to stop and fix that one thing. Opening the adhesive to 'see how it goes' converts a recoverable preparation problem into a bonded joint that has to be removed and redone.

When restoration is the wrong answer

Restoring a way is not always cheaper than the alternatives, and there are cases where it should not be attempted at all.

Deep damage that has taken the way below the point where machining back to clean metal still leaves an acceptable surface is a structural problem, not a lining problem. Weld repair over a large area of cast iron introduces distortion that has to be machined out, and the machining has to stay within what the geometry allows - a way that is already low cannot afford to lose more. Where both conditions fail, the realistic options are a rebuilder's assessment or a different machine.

The same applies where the damage is a symptom rather than a cause. Scoring that keeps coming back after a correct reline usually means the machine is still producing the conditions that caused it - a chip path that is not sealed, wipers that are not doing their job, or a lubrication film that is failing at the ends of the stroke. Repairing the way and bonding a new liner without addressing that is a scheduled repeat of the same job.

The useful rule is that restoration should return the way to the condition the liner was designed for - flat, clean, and continuous under the contact band. Work that goes beyond that, to make a worn machine into a new one, belongs in a rebuild decision, not in a lining job.

Quick answers

Can a thin liner be bonded over light scoring without machining the way?

Over cosmetic marking that sits inside the original machining marks, yes - provided there is no raised lip and the straight edge does not rock. Once metal has been displaced or removed enough to hold a feeler, the liner will follow that shape and the joint will be unsupported above the groove. The test is physical, not visual: a straight edge plus feeler stock, and a stone along the way to expose burrs.

Is welding the standard way to fix scored cast iron guideways?

It is one of three routes, and it is the right one mainly for localised grooves surrounded by sound metal. It brings heat into a casting that was never designed to be welded, so distortion and local hardening are part of the job, not accidents, and machining after welding is usually needed. Broad uniform wear is better served by selective deposition or by machining the way back to a true surface.

How do I know the repaired surface is ready for adhesive?

Confirm flatness along the whole contact band with a straight edge and feeler stock in several positions, no raised lips at repair edges, consistent roughness across repaired and original areas, no oil residue on a white cloth wipe, and that the way stays protected from dust after cleaning. Check the surface with marking paste against a true reference rather than by eye. If any of these cannot be confirmed, fix it before mixing adhesive.